PERFECT BINDERDB-200OPERATION MANUALDuplo USA Corp.February, 2000 LED Rev. 1.0
72. After the first notching process, the clampstation will remain to the left side of DB-200and the LED display of the control panel willdisplay and
8(C) AUTO MODE :Note: All books done in this mode must be same thickness.1. In the MANUAL mode, make one book.Centering the cover to the centered poin
94. Place the cover sheet onto the nipping stationwhen the display flashing "LOAD COVER".The clamp station will automatically moveback to th
10(D) PADDING MODE:“PAD” is one of the DB-200 operations that apply to special binding applicationssuch as binding without cover sheet.1.NotePress “FU
11(2) Having moved to the left position of DB-200, the clamp station will automaticallymove back to the right position and display"BIND".(3)
12 (F) GLUE LEVEL ADJUSTMENT :The glue level may require adjustment when the thickness of the book or pad varies. Usethe following book spine illustra
13(G) NIPPING PRESSURE CONTROL :The nipping pressure control knob islocated on the left-side of the machine(next to the power switch). It allows you t
14MaintenanceCleaning ProceduresAfter you have finished using the binder for the day, follow the following steps:1. Close the clamps while the LED di
15The fastest speed of settings that AUTO mode can perform is:TR1 = 2 sec., TR2 = 0.5 sec., TR3 = 1 sec., TR4 = 0.5 sec., TR5 = 0.5 sec.• Note that t
Table of ContentsSafety Notes ...
1Safety NotesKeep the following in mind for safe operation.• Only experienced technicians are allowed to remove covers and repair the machine.• Do n
2General InformationMain Assemblies(1) Nipping Station(2) Glue Tank(3) Notching Station(4) Clamp Station(5) Control Panel(6) Nipping Pressure ControlS
3Installation Note: You must remove the three red shipping brackets before installing your DB-200. The procedures for installation:1.Remove the red s
4Control PanelNo. Name Description LED Display /Example1 EMERGENCY Stop all the actions of the machine.Except when “HOT” shows on theLED DISPLAY.“STOP
5Operation Procedures(A) STARTUP :1. Turn ON the power switch of DB-200 as shown.( where “I” for ON; “O” for OFF )The heater of DB-200 will automatica
6(B) MANUAL MODE :After the “STARTUP” procedures, the DB-200 will automatically set itself MANUALoperation and flashing "LOAD BOOK" display.
Commentaires sur ces manuels